• Register
  • Login
  • Persian

Nuclear Technology and Energy

  1. Home
  2. Fire simulation in the control room of Bushehr nuclear power plant by CFAST software

Current Issue

By Issue

By Author

By Subject

Author Index

Keyword Index

About Journal

Aims and Scope

Editorial Board

Publication Ethics

Indexing and Abstracting

Related Links

FAQ

Peer Review Process

Journal Metrics

News

Fire simulation in the control room of Bushehr nuclear power plant by CFAST software

    Authors

    • Sahar Mojab 1
    • Ehsan Zarifi 2
    • Gholam Reza Jahanfarnia 3
    • Masoud Mansouri 4

    1 Islamic Azad University, Science and Research Branch, Tehran

    2 Reactor and Nuclear Safety Research School, Nuclear Science and Technology Research Institute

    3 Islamic Azad university, Science and Research Branch. Tehran

    4 Islamic Azad University Science and Research Branch

,
10.48308/nucte.2023.101468
  • Article Information
  • Download
  • How to cite
  • Statistics
  • Share

Abstract

The main control room is one of the parts of a Nuclear Power Plant that is often identified as a part of the high fire risk in fire risk assessments. Due to the importance of fire in the main control room of Bushehr NPP-Unit 1 (BNPP-1), in this study, by using the CFAST code which is one of the deterministic safety analysis code, the fire in the main board of BNPP-1 is simulated and the results are evaluated. Required data has been extracted from safety analysis reports, and operating documents of BNPP-1 and NUREG6850 report to simulate fire. The highest recorded temperature was measured in the upper layer of the standing cabinet, about 1013C, which was result of flames and heat transfer through smoke (convection). Another highest recorded temperature was at the lower wall of the standing cabinet, measured about 700C; this temperature was due to flames of fire and also because of radiation heat transfer. The first ventilation system was blocked in 350 seconds after the start of the fire, and the second ventilation system was blocked in 860 seconds after the start of the fire.

Keywords

  • Fire
  • Main control room
  • BNPP-1
  • Deterministic Safety Assessment
  • CFAST code
  • DSA
  • XML
  • PDF 461.61 K
  • RIS
  • EndNote
  • Mendeley
  • BibTeX
  • APA
  • MLA
  • HARVARD
  • CHICAGO
  • VANCOUVER
    • Article View: 2,225
    • PDF Download: 874
Files
  • XML
  • PDF 461.61 K
Share
How to cite
  • RIS
  • EndNote
  • Mendeley
  • BibTeX
  • APA
  • MLA
  • HARVARD
  • CHICAGO
  • VANCOUVER
Statistics
  • Article View: 2,225
  • PDF Download: 874

APA

Mojab, S. , Zarifi, E. , Jahanfarnia, G. R. and Mansouri, M. (2023). Fire simulation in the control room of Bushehr nuclear power plant by CFAST software. Nuclear Technology and Energy, 1(4), 10-14. doi: 10.48308/nucte.2023.101468

MLA

Mojab, S. , , Zarifi, E. , , Jahanfarnia, G. R. , and Mansouri, M. . "Fire simulation in the control room of Bushehr nuclear power plant by CFAST software", Nuclear Technology and Energy, 1, 4, 2023, 10-14. doi: 10.48308/nucte.2023.101468

HARVARD

Mojab, S., Zarifi, E., Jahanfarnia, G. R., Mansouri, M. (2023). 'Fire simulation in the control room of Bushehr nuclear power plant by CFAST software', Nuclear Technology and Energy, 1(4), pp. 10-14. doi: 10.48308/nucte.2023.101468

CHICAGO

S. Mojab , E. Zarifi , G. R. Jahanfarnia and M. Mansouri, "Fire simulation in the control room of Bushehr nuclear power plant by CFAST software," Nuclear Technology and Energy, 1 4 (2023): 10-14, doi: 10.48308/nucte.2023.101468

VANCOUVER

Mojab, S., Zarifi, E., Jahanfarnia, G. R., Mansouri, M. Fire simulation in the control room of Bushehr nuclear power plant by CFAST software. Nuclear Technology and Energy, 2023; 1(4): 10-14. doi: 10.48308/nucte.2023.101468

  • Home
  • About Journal
  • Editorial Board
  • Submit Manuscript
  • Contact Us
  • Sitemap

News

  • Nuclear Technology and Energy 2021-09-15

Newsletter Subscription

Subscribe to the journal newsletter and receive the latest news and updates

© Journal management system. designed by sinaweb